Using Block Substitution with a Lift Plan Graphic
When a profile graphic, plus any additional ones needed for the selected structure's block substitution, that graphic can be placed directly into the tie-up.
However, if a profile graphic fits in width, but not length, then it needs to be pasted into a liftplan, then converted to a tie-up before it can converted with block substitution.
The following video shows a profile graphic that is too long to paste directly in the tieup. This graphic is adjusted so that it will fit, along with the two extra shafts needed for tie-downs in the summer and winter structure, and also has room for background in order to put spacing between the graphics.
Last updated
Was this helpful?